After repeated violations of long-term phosphorus levels in the , Ä¢¹½Av has released recommendations to stop the further increase of this pollutant in one of Florida's special places. and learn how Ä¢¹½Av is working to protect our water supply for people and the environment.
:
- Dedicate resources towards a stronger Best Management Practice (BMP) monitoring and enforcement effort. Pursue BMP rule changes to require more accountability and consistency of BMP implementation by individual farms.
- Reconsider the current regime of Everglades Agricultural Area-wide averaged compliance in favor of compliance by individual farm or sub-basin. In the alternative, the 25% reduction below baseline compliance threshold should be raised significantly.
- Enact BMP rule changes to increase reliance upon and requirements for the most effective BMP strategies, such as “Sediment Control� BMPs that require more intense management of on-farm ditches and canals and “Water Management� BMPs that retain water on farms and reduce discharges.
- Emphasize Source Control strategies that create smaller impoundments spread throughout “hot spots� and “problem basins� such as S5-A to retain waters with higher phosphorus loads in those basins for a head start on treatment before the water reaches Stormwater Treatment Areas.
For more information, please our latest fact sheet.